泥沙沉降
基于1个网页-相关网页
sediment settlement
以上为机器翻译结果,长、整句建议使用 人工翻译 。
The operation design must meet with its operation conditions of the operation level, design inflow discharge, sediment concentration, sediment settlement design standard and the operation time.
运行设计应满足沉沙池运行水位、设计入池流量、含沙量、泥沙沉降设计标准和运用时间等运用条件。
youdao
应用推荐
模块上移
模块下移
不移动