Mechanical behavior of lining structure is analyzed under 10 different conditions that high water pressure suddenly effluent water upon 8 different parts of tunnel section with FEM numerical model.
用有限元数值模型,分析隧道断面上8个不同位置10种不同水压突水条件下衬砌结构的受力特征。
It is important and difficult for design and calculation of concrete buoyancy in construction of formwork lining trolley with full circle section.
在全圆断面模板衬砌台车的施工应用中,混凝土浮力的设计计算是重点和难点。
This paper introduces excavation of the unfavorable geological section of tunnel project of Wanjiazhai YRDP, temporary brace and construction of concrete lining.
文中介绍了万家寨引黄隧洞工程不良地质洞段施工中的开挖,临时支护,混凝土衬砌等。
应用推荐