Base on the site observation and experimental research, the paper studied the top coal structure for the top coal caving mining in steep inclined seam sections.
在现场观测及实验研究基础上,对急倾斜水平分段放顶煤开采过程中顶煤体结构进行了研究。
First, based on similar material model test, top coal cave-in characters in steep and thick seam were studied as well as failure law of main roof and features of surface subsiding.
首先利用相似模拟实验研究了急斜特厚煤层顶煤的冒落特征、顶板的破坏规律,以及地表下沉的特点。
Through numerical simulation and analysis, the top coal movement and stress distribution in mechanized top caving mining of thick coal seam is revealed.
通过数值模拟分析,提示了厚煤层综放开采时顶煤运移和应力分布规律。
应用推荐