·2,447,543篇论文数据,部分数据来源于NoteExpress
Brake was installed at the top of the ball screw. When die and punch moved to the right position, the ball screw was stopped at first and then began pressing.
在滚珠丝杠的端部安装制动器,当凸凹模具运动到位,先通过制动器制动滚珠丝杠,然后再开始冲压。
youdao
应用推荐
模块上移
模块下移
不移动