Lot sizing and scheduling are the two major aspects of production planning and control (PPC).
分批与调度是生产计划与控制(PPC)的两个主要方面。
The characteristics and fundamentals of ore drawing control in block caving method are described and computer-based production scheduling for this mining method is studied in the paper.
本文阐述了自然崩落法放矿的特点及其放矿管理的基本原理,探讨了应用计算机进行自然崩落法排产的基本方法。
The control and scheduling of production planning of FMS act as the core of FMS running control system, and one of the key technologies as well which decide if FMS can obtain anticipated profit.
在FMS中,生产计划调度与控制是FMS运行控制系统的核心,是决定FMS能否取得预期经济效益的关键技术之一。
应用推荐