For several characteristics, such as large cost, long time, various activities,complicated construction condition, and easily affected by nature condition, it isenormous system engineering to frame the construction schedule planning, which isjust the difficulty in construction organization design.
大型水电工程由于工期长、投资大、工序多、施工条件复杂,且极易受自然条件影响,因而制定其施工进度计划是一项庞大的系统工程,而这也是施工组织设计的难点。
参考来源 - 水电工程施工进度优化及控制方法研究·2,447,543篇论文数据,部分数据来源于NoteExpress
It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.
在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。
This research result in efficient regression testing by helping testers decide what classes and methods need to be retested, and in supporting cost estimation and schedule planning.
本文的研究能帮助程序开发人员在回归测试中确定需要重测的类和方法和成本估算及制定进度计划。
Task and schedule planning template. The RUP provides limited support to team members on how to manage work within an iteration. In the RUP, iterations can last for weeks or months.
任务和进度计划模板RUP在一次迭代过程中对团队成员如何控制工作仅提供有限的支持,而RUP的一次迭代可能持续数周或数月。
So it kind of messes up whatever schedule you're planning on taking.
这会对你制定的计划带来一些麻烦。
应用推荐