In the last, the paper designs and analyses the Graph Theory algorithm and drives a conclusion that the problem of the arranging of curriculum schedule is NP - hard problem.
在文章的最后我们对课表超图的图论算法进行设计与分析,并得出该问题是一个NP难问题。
Estimate-convergence graph for software development, taken from Lecture 3, entitled "Software Schedule Estimation, " in the lecture notes section. (Image courtesy of MIT OCW. )
软体开发的预估收敛图, 取自课堂讲稿第三课,讲题为「预估软体开发的时程」。(图片由麻省理工学院「开放式课程网页」提供)
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
应用推荐