The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
In the last, the paper designs and analyses the Graph Theory algorithm and drives a conclusion that the problem of the arranging of curriculum schedule is NP - hard problem.
在文章的最后我们对课表超图的图论算法进行设计与分析,并得出该问题是一个NP难问题。
Estimate-convergence graph for software development, taken from Lecture 3, entitled "Software Schedule Estimation, " in the lecture notes section. (Image courtesy of MIT OCW. )
软体开发的预估收敛图, 取自课堂讲稿第三课,讲题为「预估软体开发的时程」。(图片由麻省理工学院「开放式课程网页」提供)