And than the optimal design method of SBR system is summarized, evaluated and discussed.
然后据此总结出s BR的优选设计方法,并进行评价和讨论。
Simulated wastewater was used for teeing phosphorous removing effect and the factors of influence of SBR system.
采用人工合成废水,考察了SBR生物除磷工艺的除磷效果和影响除磷效果的一些因子。
The process characteristics of the EM-SBR system treating domestic wastewater and the best EM adding period were researched.
研究了EM-SBR处理生活污水的工艺特征和EM菌的最佳投加周期。
应用推荐