Meanwhile, F108 was initially designed without HPSSH in convection section, and the saturated vapor generated was sent to vapor superheating furnace for superheating.
同时,最初设计时F108炉对流段无超高压蒸汽过热段(HPSSH),其产生的饱和蒸汽送到蒸汽过热炉进行过热。
There the hot gases leaving the flame region superheat the saturated steam produced in the boiler section.
热气从火焰区出来,对锅炉管道里产生的水蒸气进行过热。
应用推荐