This thesisestimates siltationintensityof Guangli channel by the obtained dataand the data of numericalsimulation, andsuggests the dredgedsand volume from the channel every year.
This problem was avoided in 2004, but unfortunately, on that occasion, the volume of sand available behind the dam was too low to rebuild the sandbanks.