Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.
图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
Sample scenario: Simple material master creation approval.
示例场景:简单的材料主数据创建审批。
A sample entry from the master detail Input is displayed on the left-side tree, while the right-side tree defines the Output template of the transformation.
左侧的树中将显示来自主细input的示例条目,而右侧的树则定义转换的Out put模板。
应用推荐