It is also known that identifying risk factors and improving safety measurements can reduce the risk level for equipments.
同时通过评价,识别导致事故的危险因素,完善安全措施,可以进一步降低装置的风险度。
In order to survey the structural behavior and the safety during the construction, stress measurements of the tied beam and spatial analysis of the structure are carried out.
阐述了该桥的预应力施工技术,分析了桥梁在施工各阶段的受力特征,并结合系梁的实测应力,对施工过程中的结构安全性进行了评价。
In this study, the rock stress around the tunnel is discussed based on the initial stress measurements obtained in the rock burst field, and safety control based on AE monitoring is explained.
在这项研究中,在隧道附近的岩石重音被谈论根据在岩石爆炸领域得到的最初的重音测量,并且根据AE监视的安全控制解释。
应用推荐