Based on the data, the relevant trial section was constructed with which studies were made on construction techniques of dry compaction and road performance with the 3 types of soils.
在此基础上修筑了相应的试验路段,进行了3种典型土类的路基干压实施工工艺及路用性能试验研究。
The paper develops and derives the settlement after the construction road embankment by invert analysis method, using the measured data in the site.
本文利用现场实测数据,用反分析法推求路堤的工后沉降。
应用推荐