river closure system 截流系统
nd phase inner river closure 二期内江截流
river closure design 截流设计
river closure construction 截流施工
river closure risk 截流风险
river closure work 截流施工
river closure mode 截流方式
river closure time 截流时间
river closure test 截流试验
The suggested discharge for 3rd-stage river closure of TGP is 12200 m3/s ,and the final water drop is 5.77 m,thus,the closure work will be the largest o ne of comprehensive difficulties in the world.
三峡工程三期截流,流量为12200m3/s,落差为5.77m,此截流工程将是目前世界上综合难度最大的截流工程。
参考来源 - 对三峡工程三期截流的几点认识 Some recognitions on TGP's 3rd·2,447,543篇论文数据,部分数据来源于NoteExpress
The main river closure is one of key techniques for the Three Gorges Project.
长江三峡工程大江截流是三峡工程的关键技术之一。
The site river closure construction must be organized carefully, properly and scientifically.
现场截流施工必须认真合理地组织和科学地指挥。
Therefore, river closure measures should be fully proved to be reasonable and more operational.
因此,对截流措施应进行充分论证,使其趋向合理、更具有可操作性。