Laxiwa Hydropower Project is the biggest waterpower pivot engineering on the upper reach of the Yellow River.
拉西瓦水电站为黄河上游最大水电枢纽工程。
Water conservancy and hydropower project involves a great deal of hydraulics problems, including hydraulic hydraulics, river dynamics, engineering hydraulics, hydropower station's hydraulics.
水利水电工程中涉及大量的水力学问题,包括水工水力学、河道水力学、工程水力学、水电站水力学等。
This article unifies the project example, introduced Nanjing fourth Yangtze River Bridge south of section S3wiring engineering construction technology for pile foundation in Karst area.
文章结合工程实例,介绍了南京长江第四大桥南接线工程s3标段岩溶地段桩基础施工技术。
应用推荐