目前,对知识产权的攻击方式主要有三种:软件盗版 (Software Piracy),逆向工程 (Reserve Engineering),代码篡改 (Code Tamper),对应的防御措施主要有软件水印技术 (Software Watermarking),代码模糊 (Code Obfuscation),软件防篡改 ...
基于12个网页-相关网页
By using drilling in pit, ore reserve classification is increased, risks of underground mining engineering are reduced and avoided.
主要阐述了矿区通过实施坑内钻探,提高储量级别,降低和避免井下采矿工程风险,节约了成本,增加了效益。
Optimal designed power system, professionally matched high power engineering low-speed large-torque engine, with reliability or endurance, and higher power per liter and torque reserve coefficient.
采用专业定制的大马力工程版低速大扭矩发动机,可靠耐久、升功率和扭矩储备更高。
During the mineral resource and reserve checking, the surveying data of mining engineering shall be checked.
在矿山资源储量核查中,应对其采矿工程测量资料进行检测。
应用推荐