unit required quantity 单位需求量
coal required quantity 煤炭需求量
required quantity field 需要量字段
required quantity according to plan 计划需求量
required air quantity 所需空气量
quantity required 需求数量 ; 所需数量 ; 需要数量 ; 数量
actual required air quantity 实际需要风量
unit quantity required 所需单位数量
fixed quantity required 固定数量需求
The paper USES the grey system theory, and sets up forecasting method GM (1, 3) to coal required quantity.
运用灰色系统理论,建立煤炭需求量的灰色预测模型GM (1,3)。
Erro measurement of daily timing, period switching, required quantity display and required quantity period can be carried out.
能进行日计时、时段投切、需量示值、需量周期的误差计量。
On the basis of this, a new method for forecasting and controlling required quantity of enterprise human resources is obtained.
在此基础上,得到了预测企业人才需求量的方法及控制手段。
应用推荐