c c.t, C.3 由移去一恢复(remove-restore)技术计算重力似大地水准面 10 似大地水准面的计算公式: }=害≥』s(P)(△g。+TC)dO-m嘉^(△g--re触)一嘉nG2D渐2+k…
基于8个网页-相关网页
The GPS-levelling is used to add constraints on the simulated geoid, and the "remove-restore" method and the multi-quadric function method are used to interpolation, so as to obtain the refined geoid.
利用GPS水准对模拟大地水准面进行约束,采用“移去——恢复”技术和多面函数法进行拟合内插,得到转换后的大地水准面。
We must cut carbon emissions by 80% from their 2006 levels by 2020, stabilize the world's population at eight billion by 2040, completely remove poverty, and restore forests and soils.
到2020年,我们必须在2006年的基础上减少80%的碳排放,到2040年将世界人口稳定在80亿,彻底消除贫困,恢复森林和土壤。
Until recently, the main reason for removing dams was to restore salmon runs, but it is now recognized that a more important reason to remove dams is that they are no longer safe.
直到近期,拆除大坝主要还是为了恢复鲑鱼的数量,但现在人们认识到,拆除大坝的一个更重要的原因是这些大坝已不再安全了。
应用推荐