At last, the outage costs are used on reliability optimization project are theoretically discussed.
最后,对于停电损失运用于可靠性优化规划,从理论上作了初步探讨。
The paper discusses the combination of reliability design and optimization design leading to the reliability optimization design of aviation gears transmission for an optimization project.
将可靠性设计和优化设计结合起来,对航空齿轮传动进行可靠性优化设计,以得到最佳的设计方案。
应用推荐