Simulations show that the provenance based equipment scheduling algorithm increases user satisfaction to 80% compared with the random scheduling algorithm.
实验结果表明:相对于随机调度算法,基于溯源信息的设备选择算法使得用户满意程度达80%。
The paper describes the feature of the automatic generation system for examination ID CARDS, the strategy of random scheduling and the main algorithm for creating examination ID CARDS.
论述了考场考证自动生成系统的特点,随机生成考证的策略及考证生成的主要算法。
This paper is concerned with single machine stochastic scheduling problems with random ready times, processing times and due dates to minimize the number of tardy jobs.
讨论了工件准备时间、加工时间和交货期都为随机变量的单机调度问题。
应用推荐