Theprincipleofreactor trip protectionsystemdesignandsetpointdeterminationis that power plantoperationrange should be extended as large as possibleon the basis of plantsafetyguaranteed.
Their conclusions: The "hurricane protectionsystem" built by the Corps had serious design and construction flaws, baked into the system over 40 years under administrations of both parties, that caused catastrophic failure in more than 50 locations under storm surge conditions markedly less than the system was advertised to withstand.
These solutions integrate seamlessly with multi-vendor and legacy protection relays and devices and enable easy expansion, installation and testing, along with flexibility in design, engineering, commissioning and upgrades throughout the life of a protection and control system.