This activity had a proper program design, detailed rules, clear division of different jobs, and material preparation, so the activity was a big success.
此次活动方案设计得当,规则制定详细,人员分工明确,材料准备充分,所以活动十分成功。
According to the principle of slotting optimization, an index system is proposed for choosing proper program.
根据货位布局应遵循的原则,建立了选择方案的指标体系。
Before sales: learn the washing technique, equipment conditions and internal simulation test of the client and make proper program.
售前:了解客户清洗工艺、设备状况、公司内部模拟测试,制定相应方案。
应用推荐