The EJB proxy approach described in this article is best used when you need a lightweight, low-cost solution for sandbox, test, or proof-of-concept situations.
本文中所述的EJB代理方法最适合用于需要轻量级低成本解决方案来满足沙箱、测试或概念验证需求的情况。
I use a dynamo to save the cost of batteries to both my pocket and the planet, and puncture-proof tyres to make sure I'll never need disposable repair kits again.
我用了一个发电机,省下了我的兜里买电池的钱,备上防穿刺的轮胎来确保我不再需要一次性修理工具。
Use cases to proof that the cost accumulative curve technique and network optimize technique can be applied to manufacture phase of air-preheater to control the cost.
以案例证明了在预热器制造环节中是可以应用成本累计曲线法和项目网络优化技术来控制产品制造成本的。
应用推荐