It raises the relevant control measures aimed to effect units installation accuracy, cycle problem, etc. caused by civil design and construction during welded pipe production line project.
针对焊管生产线工程中一些由土建设计、施工带来的直接影响设备安装精度、周期等问题,提出了相应的控制措施。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
Design management is important to construction project management on the ground of life-cycle of project Theory and the datum of quality accidents of construction engineering.
根据项目全生命周期理论和对建筑工程质量事故的调查数据,设计管理对建设项目管理尤为重要。
应用推荐