Sizing and scoping drives every aspect of the project, constrains the actions that can be taken in the development or upgrade of a product, and limits available options.
确定规模和范围是驱动项目各个方面的动力,约束那些在产品的开发和升级中所采用的行动,以及限制可以提供的选项。
For example, the selection of large-grained assets typically represents a major architectural decision on the project, which then constrains and guides the selection of finer-grained assets and so on.
例如,粗粒度资产的选择主要代表了一个项目的主要构架决策,以后它就能够限制并引导精细粒度资产的选择等等。
In conclusion the thesis gives an example to explain how time constrains act on the processes and validate the modeling method and the realization scheme in this project.
本文举出了新品开发流程实例,来说明时间约束如何应用于具体流程,以及验证本课题提出的建模方法和实现方案。
应用推荐