项目基准 (Project Baseline) 3.1 合同双方的主要职责分工 (Contractual Obligation) 根据实际情况填写。 参考3.2 sample.
基于16个网页-相关网页
APBAcquisition Project Baseline 收购项目基线
Baseline Project 基线计划
Project Performance Baseline 基准
Baseline Project Plan 专案计画书的内容
To determined if proposed modifications to the project baseline should be made, what should be put in place?
为了决定是否对项目基准按建议的修改进行更改,以下何项应安排到位? 。
But while change control does need to be a strict process that treats the project baseline as holy, it does not need to be inflexible.
但是变更控制并不需要严格到把项目基准神圣到不可侵犯的程度,弹性是必要的。
The project baseline captures the project's predicted scope, time, and costs at the very beginning stages, or anytime thereafter if someone chooses to change them.
项目基准是预定的范围,时间和成本。项目基准在项目开始时制定,有时也会因为一些需要在后期改动。