Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Also, when some requirements must be changed, this tool can provide impact analysis for the project leader. And then the leader can control the whole developing process.
并且当有需求变更时,此工具可以给项目负责人提供变更影响分析,便于负责人控制整个开发过程。
The project and arithmetic how to control the vacuum degree are introduced by the analysis of the reason why the vacuum degree is unstable.
本文在分析电子束炉真空度不稳定原因的基础上,阐述了新的真空系统控制方案及其算法。
应用推荐