Note that the values in reduction mode have tobe chosen in such a way that the facility has reached the GMP-compliant statein due time before production begins (integration of a time program).
注意,在降低功率的模式下的值的选择必须使得设施在生产开始之前的规定时间内(时间计划结合在其中)达到GMP符合状态。
Output or production, as of a computer program, over a period of time.
生产量,通过量,吞吐量如计算机程序在一定时间内的输出或成果。
The time in which equipment is in actual use, such as production time, incidental time, development time (program), etc.
指实际使用设备的时间,例如生产时间、附随工作时间、程序开发时间等等。
应用推荐