Offshore production platforms in Bohai Gulf experience ice loading for more than three months each year.
我国渤海每年约有三个多月的结冰期,冰与海上采油平台的相互作用,远较波浪为甚。
It allows the development and production platforms to co-exist on the same hardware and permits switching from one to the other just by rebooting.
它允许开发和生产平台在同一硬件上共存,并且允许通过重新引导来实现从一个平台到另一平台的切换。
Therefore, reliability analysis, especially fracture reliability analysis, for the design of fixed production platforms in ice environment or under extreme ice loads is required to be conducted.
因此,冰区固定采油平台的设计以及对服役期平台的评估,均需进行可靠性分析,而且主要是极端冰载作用下断裂的可靠性分析。
应用推荐