...不到位 ④ Loader Start Delay Time:前一块板送出多少秒后后一块板才能送入 四、生产条伯数据设置(Production Conditions Data)(共4页) 第一页:
基于20个网页-相关网页
Huidong Lead Zinc Mine set up a production data acquisition and management system with cti technique in the light of its concrete conditions.
会东矿根据具体条件,建立了应用cti技术的生产数据采集与管理系统。
Part V of the use of some specific data from the location, transportation, hydro-meteorological, production conditions, etc.
第五部分运用一些具体数据从地理位置、交通运输、水文气象、生产条件等方面先容了本项目的地理环境。
Based on the experimental data, the process conditions and selection of equipment of casein industrialization production were discussed.
以中试数据为依据,对豆酪素工业化生产的工艺条件、设备选型进行了探讨。
应用推荐