The cave's initial principal stress is tectonic stress, and the Max main stress's direction is perpendicular to the power house's stalk line.
洞室地应力以构造应力为主,其最大主应力方向与厂房轴线方向近垂直。
The time-history curve of stress, stress path and curves of the principal stress axes rotation of soil element under and beside the load moving line are presented.
给出荷载移动线正下方和荷载移动线外土单元应力的时程曲线、应力路径、主应力轴方向变化曲线。
应用推荐