At 8:20 p.m. on the day of the explosion the pressure data suggest there was a constant flow of sea water being pumped into the drill pipe that was displacing the heavier mud system which was the primary pressure control for the well.
This is what this data is supposed to monitor, but the well flow evidence would appear to have been ignored, because at this point the BP rig supervisors should have gone to a well kill operation and started to pump heavy mud back into the well bore to restore the primarycontrol mechanism.