The goal of the hearings is to examine the design and performance of the drilling rig's blowout preventer, a mammoth set of valves that is the last line of defense against an oil spill.
On May 26th BP, the company responsible for the well that Deepwater Horizon had drilled, started to pump heavy drilling mud into the well's blowout preventer, a set of valves on the sea floor.