A thrust hydraulic system of shield tunnelling machine with pressure and flow compound control was designed, and hydraulic cylinders were also controlled in groups.
设计了一种基于压力流量复合控制的盾构推进液压系统,对液压缸进行了分组控制。
The top pressure of HP column was controlled by adjusting the feed flow rate to LP, FLP.
在这个控制方案中,HP塔的塔顶压力的控制通过调节LP塔进料量来实现。
In calibrating the leak, the pressure in the ballast chamber can be precisely controlled in such a way that the standard gas flow through the orifice is close or equal to the leak rate.
在漏孔校准过程中,通过调节稳压室中的压力,很容易使标准气体流量与漏孔漏率非常接近或相等,从而避免四极质谱计的非线性影响。
应用推荐