Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
The author uses optimal method and obtains. the best regenerative parameters of this unit with the air preheater.
应用优化理论和数值计算方法,求得该机组加装暖风器时的最佳回热参数。
Two revampings of air preheater of fired heater in atmospheric-vacuum distillation unit of a refinery was introduced.
介绍对某炼油厂常减压蒸馏装置加热炉空气预热系统的两次改造情况。
应用推荐