PPP模式下大型体育场馆建设风险承担与分配研究-建筑经济 关键词] PPP模式,大型体育场馆,风险承担,风险分配 [gap=448]Key words: PPP mode, large-scale stadium, risk respond, risk assignment
基于22个网页-相关网页
Abstract: Since 1980s, the PPP mode in China has been used in infrastructure fields.
摘要:二十世纪八十年代以来,PPP模式开始应用于我国的基础设施领域。
Finally, based on the risk assignment principle, a risk assignment framework by PPP mode for large-scale stadium construction under PPP mode is proposed.
最后基于风险的分配原则,提出PPP模式下大型体育场馆建设的风险分配框架。
Based on PPP mode, introducing the market mechanism and encouraging the commercial insurance companies to take part in the medical security system become a feasible way.
基于公私合作模式,引入市场机制,鼓励商业保险机构参与到医疗保障体系中成为一种可行的方法。
应用推荐