China will start building its first large nuclear-power reactor with home-developed 'fourth generation' technology in 2012-13, a senior engineer involved in developing the system said.
中国原子能科学研究院实验快堆工程部总工程师徐说,2012 - 2013年,中国将开始利用自主研发的“第四代”技术,建造中国首个大型核电反应堆。
Service engineer of maker shall carry out automatic control system generator set (auto power station) test.
对于自动化电站发电机的自动控制功能由厂商的服务工程师完成。
Work with NPD manufacturing engineer on line setup, specially on power supply, pneumatic system and ESD system.
和新产品导入工程师一起完成生产线的布局建立,特别是电,气和防静电系统。
应用推荐