For a thermal power generating set, the automatic adjustment of water supply during operation under low load is always the bottleneck for the realization of full-scale water supply automatic control.
火力发电机组低负荷运行阶段的给水自动调节一直是实现全程给水自动控制的一个难点。
Last month Iran passed its latest milestone with the fuelling of its first power-generating reactor, set up long ago by the Russians at Bushehr.
上个月,伊朗迈过了最新的里程碑——为早前由俄罗斯在Bushehr建造的伊朗第一个发电反应堆添加了燃料。
应用推荐