The development of emergency action levels (EALs ) is most important for implementing effectively the emergency planning of nuclear power plants.
制定应急行动水平对实施核电厂应急计划的有效性起着重要的作用。
The planning and construction of power network have entered a stage of rapid development and caused increasing concern.
电网规划及建设在近年已进入了高峰期,并得到了越来越多的重视与关注。
Network optimization is normally calculated for each planning level year in medium and long term power system development planning.
对于中长期电网规划,通常考虑各规划水平年的网络优化计算。
应用推荐