Four check the project refers to the post one day a week, the team workshop check check, check, plant in January one quarter of the company.
四查工程指的是岗位一天一查、班组车间一周一查、厂级一月一查、公司一季一查。
In the workshop and post production, tools, equipment and materials, etc. the workpiece location must be standardized to meet the standard requirements, the implementation of on-site management.
在企业车间和生产岗位,工具、设备、材料、工件等的位置要规范,要符合标准要求,实行现场定置管理。
NOTE: if you must remove any component and sent to workshop, print the PFR (Post Flight Report) and TDS (Trouble Shooting Data) (if existed), then attach printed documents on the part.
注:如果有部件要拆下送修,打印相关的PF R(航后报告)和TDS(排故数据)(如有),并将其附在所拆下的部件上。
应用推荐