·2,447,543篇论文数据,部分数据来源于NoteExpress
If the column is damaged after we need to replace the column and buried the post should be as far as possible the soil compaction, and to ensure that not less than before the pavement.
如果立柱受损后我们需要更换立柱,埋设立柱后应尽量把土压实,并保证不低于之前的路面。
youdao
应用推荐
模块上移
模块下移
不移动