Then the methods of how to compensate the error amplifier is introduced, a double-zero, double-pole construction is analyzed individually.
引入了误差放大器的频率补偿的方法,并着重分析了双零点、双极点的补偿电路。
It describes that tower construction technique, process, strength calculation and apparatus selection by using the internal gin pole.
并介绍内抱杆组立铁塔施工技术、施工工艺、受力计算和工器具选择。
The measuring data of high building construction indicate that the calculating result is close to measuring result and useful in design of pole foundation as reference.
高层建筑工程的实测数据表明,该公式与实际吻合较好,因此在桩基础的设计中具有一定应用借鉴价值。
应用推荐