2) End pumping concrete pump after the anti-1 ~ 2 cycle, the elimination of stress pipeline, point push the buttons, so that concrete cylinder piston back last point. Such as pumping up and there is need to turn off the valve to prevent backflow of concrete.
基于1个网页-相关网页