The brake beam(connecting plate) is often broken, and the bolts for fixing the connecting plate are loosed due to the crane′s dynamic load when D series of crane beams are working in a steel plant.
某钢厂列吊车梁在工作中,由于吊车工作的动态作用,导致制动梁(连接板)经常发生断裂,固定连接板的螺栓松动。
This is a steel plate for crane.
这是用于起重机的钢垫板。
A novel two-component epoxy adhesive with high adhesive strength was developed to meet the bonding requirement of mounting plate of crane rail and steel beam in the workshop.
根据车间内钢梁上吊车轨道安装底板与钢梁粘接的具体要求,研制了一种中温固化双组分环氧胶粘剂。
应用推荐