Where the organization determines the need for change to the quality management system (see 4.4) the change shall be carried out in a planned and systematic manner.
当组织决定改变质量管理体系的需求(见4.4),这些改变应当有计划地和系统地进行。
The methods validation process for analytical procedures begins with the planned and systematic collection by the applicant of the validation data to support the analytical procedures.
分析方法的验证过程是从申请者有计划地系统性收集验证资料以支持分析方法开始的。
Objective To examine the clinical outcome of systematic and planned functional rehabilitation after heel reconstruction.
目的探讨足跟再造术后系统性、计划性功能康复的应用效果。
应用推荐