In plan optimization module, the access path selection and the account method of cost evaluation are discussed in detail.
在计划优化模块中,详细讨论了存取路径的选择和代价评估的计算方法。
According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
应用推荐