Result showed that the construction would be the worst stress condition and unloading effect occurred when the middle pit was excavated with both-side leading pit method being applied.
中洞上步开挖是施工过程中最不利环节,容易产生较大的卸荷效应,引起拱顶和地表的大幅度沉降。
The numerical simulation procedure by this method is presented on the construction procedure of a pit.
用该方法对基坑施工的工程进行了数值模拟。
A method of buffer blasting used in the open pit is presented in this paper.
本文主要介绍了目前露天矿山开采使用的“压碴爆破”方法。
应用推荐