Considering the obvious decrease of the pit bottom bounce capacity and differential settlement, the inverted construction method is widely used.
考虑到施工过程中对基坑底部回弹量和差异沉降量的明显减小,逆作法目前取得了较广泛的应用。
Results show that exposure time of pit bottom soil affects notably the diaphragm wall displacement during the periods of both soil exposure and pit bottom construction.
本文就坑底土层局部加固对支护结构位移的影响效果和规律,结合工程实例,并从理论上进行了分析研究。
The toothpicks will rest on the rim of the glass and hold the pit in place so it doesn’t sink to the bottom.
三根牙签搁在玻璃杯的边上固定住了核,让它就这样不会沉到底。
应用推荐