Allen said that in preparation for the storm, crews had pulled the drill string out, put a plug known as a "packer" in the casing pipe and filled the riser with seawater so the pipe would be stable.
As early as five hours before the explosion drillers noticed unexpected loss of fluid in the riserpipe, indicating leaks in a part of the blowout preventer.
Inside the riserpipe is a space about half a meter in diameter, large enough to hold the spinning drill pipe and bit and to allow the return flow of drilling fluid.